Feasibility Studies and Detailed Project Report

  • Traffic Surveys with latest technology like Automatic Traffic Counter and Classifier (ATCC), Videography
  • Pavement Investigation studies using latest technology
  • Network Survey Vehicle (NSV)
  • Roughness survey using Laser Profilometer
  • Falling Weight Deflector meter (FWD)
  • Mobile Bridge Inspection Unit (MBIU)
  • Road Sign boards & Pavement Marking testing using Retro Reflectometer
  • Ground Penetrating Radar (GPR)-for assessment of Underground Utilities
  • Benkelman Beam Deflection (BBD)
  • Roughness Survey using 5th Wheel Bump Integrator (BI)
  • Axle Load
  • Geotechnical Investigations
  • Pavement Design

Geotechnical Investigations

Drilling and Sampling
Hydraulic Rig
  • Field Permeability Test
  • Standard Penetration Test (SPT)
  • Dynamic Cone Penetration Test (DCPT)
  • Plate Load Test
  • Pile load Test
  • Bridge load/Proof load Test
  • NDT (Non-Destructive Test)-Rebound Hammer, UPV (Ultrasonic Pulse Velocity), Profilometer & Resistivity meter

List of Projects:

  • Consultancy Services for Feasibility study &Preparation of Detailed Project Report including LA & Other Clearance for 4- Laning of Arwal to Biharshar if from km 0.00 to km 89.00 of NH-110(New NH-33) in the State of Bihar. Client : Ministry of Road Transport and Highways
  • Consultancy Services for Feasibility study & Preparation of Detailed Project Report including LA & Other Clearance for Construction of W&S to 2 - Lane with paved shoulder from Km 41 to Km 92 of NH-2C (New NH-119) in the State of Bihar. Client : Ministry of Road Transport and Highways  
  • Consultancy Services for, Feasibility study, detailed project report survey and preparation of land plan for widening to two lane with paved shoulders from Sagara – Havinahalli – Holebaglu – Kalasvalli – Sighandoor – Markutka (junction with NH-766C) in the State of Karnataka. Client : Ministry of Road Transport and Highways
  • Consultancy Services for preparation of Detailed Project Report for rehabilitation/reconstruction of existing retained bridges in Ranchi-Rargaon-Mahulia section from Km. 114.000 to Km. 277.500 of NH-33 in the state of Jharkhand. Client : National Highways Authority of India
  • Preparation of Detailed Project Report, Pre construction activities and Project Supervision of various selected stretches from Km 221/800 to Km 290/200 of NH- 41 Naliya Jn to Narayan Sarovar the State of Gujarat. Client : Ministry of Road Transport and Highways
  • Preparation of Detailed Project Report, Pre construction activities and Project Supervision of various selected stretches Km 61/658 to Km 105/00 of NH- 953 Ahwa to Maharastra Border hilly section in the State of Gujarat. Client : Ministry of Road Transport and Highways
  • Project Management Consultancy Services for Feasibility study and detailed engineering for rehabilitation and up-gradation of NH-154A from km. 84/00 to km.93/00 and Km. 130/00 to km. 172/00 in the state of Himachal Pradesh. Client : Ministry of Road Transport and Highways
  • Consultancy Services for Preparation of detailed Project report of NH-2B for 4-laning from 00.00 km at Bardhaman to Bollapur and minimum 2-lane with paved shoulder configuration from Bolapur to 105.00 km at Mallarpur to merge with NH-60 in in the state of Maharashtra. Client : Ministry of Road Transport and Highways
  • Preparation of DPR for “Augmentation of existing 4-lane Section of NH-44 from Km. 211.00 (Kurnool) to Km. 534.72 (Devanahalli Village) in the State of Karnataka; Length: 324 Kms (6 lane). (6-lane Partial Access Controlled Highway in the State of Andhra Pradesh & Karnataka). Client: National Highways Authority of India